Volume 2017
Cost Benefit Analysis of Smart Metering
(International Journal of Engineering Works)
Vol. 4, Issue. 12, PP. 109-112, December 2017
Keywords: Aggregate Technical and Commercial losses, Peshawar Electric Supply Company, T & D losses, Head End System, Advanced Metering Infrastructure
Download PDF
Abstract
Traditionally electricity is generated near bulk storage of a resource and then transmitted to far flung areas through long and lengthy transmission lines. Thisenergy in the next phase is distributed to consumers. A fraction of electric energy lost in reaching customer’s premises is known as T&D or technical losses. Another fraction of energy lost due to electricity theft by consumers and due to errors in calculation by utility operators.These lossesare also known as commercial, non-technical and administrative losses. In Pakistan and other third world countries an enormous amount of energy is lost due to electricity theft. The portion of energy lost as unpaid back to utility causes a huge economic loss to utilities and hence the whole energy sector. The traditional electromechanical energy meter are not sufficient enough to sense and control electricity theft. The deployment of Advanced Metering infrastructure is inevitable to mitigate and control losses due to theft and it also provide exact ratio of energy used and lost.
Author
- Engr. ImdadUllah Shah: was born in Khyber Pakhtunkhwa, Pakistan. He received his B.Scin Electrical Engineering from University of Engineering and Technology, Peshawar in 2014 and M.Sc in Electrical Power and ControlEngineering from CECOS University, Peshawar. His study of interest is Smart Grid technologies. Email Address: engrimdadullah23@gmail.com
- Dr. Gul Muhammad Khan: Email Address. gk502@uetpeshawar.edu.pk
Full Text
Cite
ImdadUllah Shah, Gul Muhammad Khan, "Cost Benefit Analysis of Smart Metering" International Journal of Engineering Works, Vol. 4, Issue. 12, PP. 109-112, December 2017.
References
- [1] Technical Report (July 2009), “Reducing Technical and Non-Technical Losses in the Power Sector”.
- [2] M. Rani, F. Ramzan, A. Javed, A. Farooq, T. N. Malik (2016), “Smart Grid Implementation to Overcome Electric Power System Stress Conditions through Demand Response in Pakistan”, IEEE patent 978-1-4673-8753-8/16, 2016.
- [3] R. K. Pillai, R. Bhatnagar, H. Thukral, “AMI Rollout Strategy and Cost-Benefit Analysis for India”, India Smart Grid Forum, [online report www.indiasmartgrid.org].
- [4] EPRI Technical Report (2011), “Estimating the Costs and Benefits of the Smart Grid”.
- [5] S. Khan, H. F. Ashraf, “Analysis of Pakistan’s Electric Power Sector”, Blekinge Institute of Technology, Department of Electrical Engineering, March 2015.
- [6] M. J. Q. Silveira, “Implementation Costs of a Smart Grid Infrastructure in Future electricity Networks”, June 2011.